Corporate Headquarters
3106 South Horseshoe Drive
Naples, Florida 34104
(239) 643-2324 PH
(239) 643-1143 FX

Branch Office
5745 Essen Lane, Suite 200
Baton Rouge, LA 70810
(225) 768-1982 PH
(225) 769-3596 FX
Mailing Address
P.O. Box 1751
Baton Rouge, LA 70821-1751


  Survey Projects  

Estero Bay Aquatic and State Buffer Preserve



Project Type:
Water Quality Monitoring Plan

Project Location:
Lee County, Florida

Project Client:
Florida Dept of Environmental Protection
Coastal Engineering Consultants, Inc. was contracted by the DEP Aquatic Preserve Staff to develop a Water Quality Monitoring Plan for several parcels in the Estero Bay Aquatic Preserve. Our scope of work included the following:

Reviewed existing state and federal programs and subsequently formulated a testing protocol for evaluating both surface and groundwater quality.

Evaluated potential sites for installing monitoring wells based on accessibility, terrain, hydric patterns and environmental stability.

Reviewed field conditions and environmental resource permits of surrounding developments to justify monitoring sites and testing parameters.

Provided a location map for surface and groundwater monitoring wells throughout the parcel.

Determined costs associated with installation and operation of the monitoring sites to support future grants.

Return to Survey Projects List