Projects
Horton Park Shoreline Protection
Client: City of Cape Coral
Date: 2006 – 2012
Horton Park is located at ICW Marker 60 on the Caloosahatchee River, just south of the Veterans Memorial Bridge and Four Mile Cove Ecological Preserve. The shoreline at Horton Park along the Caloosahatchee
View DetailsLee County Waterways Surveys
Client: West Coast Inland Navigation District
Date: 2010 – Ongoing
WCIND contracted with Coastal Engineering Consultants, Inc. (CEC) to provide survey, geotechnical, and engineering services for fourteen (14) waterways in Lee County as part of the Southwest Florida Regional Waterways Management System
View DetailsBlind Pass Seagrass Monitoring
Client: Lee County Division of Natural Resources
Date: 2008 – Ongoing
Blind Pass separates Sanibel Island from Captiva Island in Lee County, Florida. Over time, sand had accumulated in the tidal channel that connects Charlotte Harbor to the Gulf of Mexico and
View DetailsBlind River Freshwater Diversion
Client: CDM for Louisiana Coastal Protection and Restoration Authority (CPRA)
Date: 2010 – 2011
The objectives of the Blind River Freshwater Diversion project were to collect, siphon, convey, and distribute water from the Mississippi River to the wetland areas adjacent to the
View DetailsAdmiralty Point Waterfront Assessment & Replacement
Client: Admiralty Point Condominium
Date: 2009 – 2010
Admiralty Point Condominium Association, an 11 acre, 166 unit development at Doctor’s Pass in Naples, Florida contracted Coastal Engineering Consultants, Inc. (CEC) in 2009 for the following services:
assist in the above and below
View DetailsBay Joe Wise Barrier Shoreline Restoration
Client: Coastal Protection and Restoration Authority (CPRA)
Date: 2003 – 2009
The Pass Chaland to Grand Bayou Pass Barrier Shoreline project is located on the Gulf shoreline in Plaquemines Parish, Barataria Basin, Louisiana. Wetland, beach, dune, and marsh habitats within the project
View Details